.6.Complete Start-up Program9.7.Temperature sensor(s) checkout (dynamically, use portable cooling element as needed for low and high temp test (s))9.7.1.Gearbox heater9.7.2.Downtower cabinet9.7.3.Other:______________________________9.8.Summary of Energy Production during tests9.8.1.kWh meter location (optional)___________________________________IDQuestionKEY:Init.Comments9.TEST WIND TUBINE IN OPERATIONAL MODE (continued)9.8.2.DataMeter ReadingsTest StartFinishKWh Prod'nTest 1:__________Test 2:__________Test 3:__________Note: Reset counters after test completion (optional)9.8.3.Special test mode checkout:_______________________________________9.8.4.Bring turbine to RUN mode and leave in service9.8.5.Other:______________________________10.Final CommentsDF23_000510_Commissioning[2].doc Page 9 of 122DF23 000510 Commissioning Printed 03/01/06National Renewable Energy Laboratory Wind Turbine Certification Team [ Pobierz całość w formacie PDF ]